Commissioning instructions


AttentionAttention!
The control systems make BÖHNKE + PARTNER and the drive system must not be commissioned before having fullfilled the following conditions:

  • The control unit has been mounted and installed according to this manual.
  • Operation and setting possibilities are all known (see user manual bp308).
  • The valid EMC-rules (electro-magnetic compatibility) are complied with!
  • Power circuit, control circuit and safety circuit have been executed and checked according to this manual (see checklist, chapter ).
  • Instructions that have to be followed when commissioning the plant have been noted:
    • First Travel with Emergency Controls (chapter 1.7),
    • First Travel with Inspection Controls (chapter 1.8),
    • First Travel with Normal Operation Controls (chapter 1.12) and
    • Commissioning of the Well Selection System (chapter 1.11).

InfoInfo!
Special executions are subject to reading the supplementary instructions prior to commissioning.
After commissioning the actual parameters are to be documented in the printout of the basic and service menu. Malfunctions stored during commissioning (batch memory/malfunction list) can be deleted in the submenu »diagnosis«. If third persons have access (e.g. janitor), protect the menues against unauthorized access by allocating a basic and a service code number (4 digits).

Caution

Caution!
Prior to each travel the operator has to ascertain that neither persons nor material are endangered.

At the acceptance test comply with the »Technical Tips« (chapter 1.3).